Disaster Planning Programs

Installing 3S remote battery powered actuators in key locations within a water or gas network means that in the event of a disaster such as a Tornado, Earthquake or similar event resources can be isolated and held back at key storage points in the system to remove the risk of network drain down. Remote rezoning can then take place at other automation points in the network to ensure that when isolation points are opened back up resources can be directed to key emergency locations such as hospitals, emergency services buildings and disaster shelters such as schools, churches and stadiums.